Residential & commercial permit drawings

Building permits for Guelph, Kitchener-Waterloo & the GTA

Our team measures the property, prepares the permit drawings and files the application for basements, additions, decks, garages and commercial fit-outs — more than 350 permits so far — and we stay on every file until the city issues the permit.

  • Site visit and measurements
  • Permit drawings to the Ontario Building Code
  • Submission through the city portal
  • Examiner comments answered until issued
Ali Muhammad, Senior Building Permit Consultant
Meet our teamAli MuhammadSenior Building Permit Consultant

About U2E Design & Build

Permit drawings and filing, start to finish

  1. 01

    Based in Guelph

    Working with building departments across Guelph, Kitchener-Waterloo, Hamilton, Halton, Peel and Toronto.

  2. 02

    350+ permits

    Basements, legal second units, additions, decks, garages and commercial fit-outs — prepared and managed to issuance.

  3. 03

    Senior-led files

    Every project is led by a senior permit consultant, with one point of contact from the site visit to the issued permit.

  4. 04

    Scoped to the property

    Zoning and Building Code checked first, so you know what can be built — and what the permit needs — before drawings start.

How it works

How the permit work moves

  1. 1

    Site visit & measurements

    We visit the property, measure what is there and go over what you want to build.

  2. 2

    Zoning & code check

    Setbacks, lot coverage, height and parking under the zoning by-law, plus the Ontario Building Code items your project triggers.

  3. 3

    Permit drawings

    Site plan, floor plans, elevations, sections and details — reviewed with you before anything is filed.

  4. 4

    Submission

    The complete application, with any engineering the city requires, filed through the municipal portal.

  5. 5

    Comments to issued permit

    Examiner comments answered and drawings revised until the permit is issued.

Client experiences

What clients say

“U2E made the entire permit process stress-free. They handled our kitchen renovation permit from start to finish, and we had approval in hand faster than we expected. Their knowledge of local building codes saved us from costly mistakes.”

Sarah Mitchell

Guelph, ON

Main Floor Renovation

“We needed a permit for our legal basement apartment and had no idea where to start. U2E guided us through every requirement, from fire separation to the separate entrance design. The rental income has been a game-changer for our family.”

David Chen

Toronto, ON

Legal Basement Suite

“As a small business owner opening my first retail location, the permit process seemed overwhelming. U2E handled all the commercial permit requirements professionally and kept me informed throughout. Highly recommend their services.”

Maria Rodriguez

Mississauga, ON

Commercial Permit

“The second floor addition permit was complex, but U2E made it look easy. Their drawings were detailed and professional, and the city approved our application with zero revisions. Outstanding service from start to finish.”

James Patterson

Kitchener, ON

Second Floor Addition

FAQs

Common permit questions

How long does the permit process take?

Most permit approvals take 4–8 weeks, depending on the municipality and scope of work. We keep you updated at every step to reduce delays.

What is the first step in a building permit application?

The first step is a project review to identify permit requirements and gather the correct documentation. From there, we prepare the application package.

Do you support both residential and commercial projects?

Yes. We support residential renovations, additions, basement suites, commercial fit-ups, and investment-property permit applications across Ontario.

Do I need a permit for a home addition?

Yes. Most home additions require permits for foundation, framing, electrical, plumbing, and structural changes. We manage the complete application.

What documents do I need for a building permit?

Common documents include site plans, floor plans, elevations, structural drawings, and a completed permit application. We verify all requirements before submission.

How do I know which drawings are required?

Drawing requirements depend on the project scope and municipality. We provide a custom list and prepare whatever drawings your application needs.

Do you handle drawings and municipal review?

Yes. We prepare drawings, submit applications, coordinate with municipal reviewers, and manage revisions until your permit is approved.

Do you work with all Ontario municipalities?

We support projects across Ontario, including Guelph, the GTA, Hamilton, Barrie, Kitchener, and more. If a municipality has special rules, we handle them.

Service area

Where we work

Based in Guelph — permits filed across Southwestern Ontario and the GTA.

Guelph·Acton·Ajax·Ayr·Baden·Barrie·Brampton·Burlington·Cambridge·Cobourg·Dundas·Etobicoke·Georgetown·Hamilton·Hespeler·Kingston·Kitchener·London·Markham·Milton·Mississauga·Morrisburg·Mount Hope·Newmarket·Niagara Falls·Niagara-on-the-Lake·North York·Oakville·Orangeville·Oshawa·Ottawa·Paris·Pickering·Port Colborne·Richmond Hill·St. Catharines·St. Jacobs·Stoney Creek·Stratford·Thorold·Toronto·Vaughan·Waterloo·Welland·Windsor·Woodstock

Start with the property

Tell us about your project

01

Planning a new project

Send the address and what you want to build. We’ll check zoning and tell you what the permit will need.

02

Already applied?

Stuck on examiner comments or missing drawings? Send the city’s notice and we’ll take it from there.